or scroll down to go through them.

Application process questions:

If all the required information and documentation are supplied timeously and required fees are paid, a quotation can be issued between 30 and 90 days. Click here for more information

It depends on the scope of work. The connection time line will be indicated on the quotation.

Eskom has to make sure that all the technical, statutory and safety requirements are met. Click here for more information.

Each application will be evaluated based on its merits and will be quoted based on its individual requirements. Click here for more information.

Yes, various options exist. Options available include: the call centre, MyEskom Customer App, SMS,
email, your customer executive, CS-Online. For detail go to Eskom’s website. Click here for more information.

Each connection has different technical requirements and therefore different cost implications. Click here for more information.

For more information consult NERSA’s website (www.NERSA.org.za)

Customers wanting to be completely off the grid should apply for termination of their supply as per the conditions of their contract.

Technical rules

This is the maximum capacity allowed for a 500kVA transformer, which is the biggest Eskom LV transformer for new supplies. For generators greater than 350kW, the customer should own the transformer so that they can manage the size of the transformer needed.

  • The 350kW limit is applied in the application of Standard charges and in compliance to the Simple
  • Connection Criteria as per NRS-0970-2-3
  • Any application on MV or >350kW on LV, will be quoted on actual costing
  • The 350kW limit is as per NRS 097 -2 -3. It was determined that this is the maximum safe capacity
  • allowed for a 500kVA transformer.

 

For all overhead line networks where there is a bulk supply to the customer at MV, Eskom will require the installation of a re-closer if there is not one installed already.

No, the customer must be on a TOU tariff with an appropriate meter.

Yes, the total generation capacity supplied by all SSEGs on the feeder should be less than 15% of the
MV feeder’s peak load.

Yes, all generator installations that are grid tied to the Eskom network need permission from Eskom  before a grid tie can be made.

Any grid-tied connection without Eskom permission is deemed unauthorized and Eskom will require the SSEG to be disconnected and a tamper fee maybe issued and lost revenue recovered. Customers are required to apply to Eskom to be grid tied.

The following are broad-based principles:

  • The generator has to be within the required size limits based on the supply point provided by Eskom.
  • The metering should be able to measure the consumed energy and any energy that is exported into
  • the grid
  • The installation will have to be tested and certified by a competent person who is registered as a
  • professional for these types of installations
  • The equipment used should be tested against specific national guidelines as contained in the NRS
  • 097 -2 -1 document

The following are the actual standards that are applicable:

  • NRS 097-2-1 GRID INTERCONNECTION OF EMBEDDED GENERATION Part 2: Small-scale
  • embedded generation Section 1: Utility interface
  • NRS 097-2-3 GRID INTERCONNECTION OF EMBEDDED GENERATION Part 2: Small-scale
  • embedded generation Section 2: Simplified utility connection criteria for low-voltage connected
  • generators
  • South African Distribution Code.
  • SANS 10142-1 & SANS 10142-1-2
  • Occupational Health and Safety Act, (Act 85 of 1993) and requirement for a COC
  • Operating Guideline for LV networks with Embedded Generation (Unique ID: 240-81732810)
  • and The Dead-Grid Safety lock specification and minimum safety requirements for LV
  • connected PV Embedded Generators (Unique ID: 240-126260252).

Information on these standards can be obtained by registering on the NRS website:
https://scot.eskom.co.za and following these steps:

1. Click on “Login” in the right-hand corner, and a login field will appear.
2. Click on “New user” and fill in your details as completely as possible.
3. Click on “Submit”

Agreements with Eskom

If your supply has been legally connected and you are on a generator tariff, then Eskom will give credits based on the offset rate for the energy exported into the grid.

Yes. To do this the points of delivery (PODs) / premises have to be consolidated into one account.  The rules for allowing consolidation are:

  • Only points of delivery (PODs) that are on the same feeder can be consolidated into one
  • account.
  • The owner of the account must be the same person or company.
  • All the PODs must be on a time-of-use tariff.

For more information click here
For PODs that are not on the same feeder, a wheeling agreement can be used, but the POD has to be
connected on medium voltage (MV) or high voltage (HV) because wheeling is not allowed on low-voltage
(LV) networks. Eskom is also evaluating limiting the number of PODs linked to an account, due to the
increasing administration burden.

To be grid-tied, the generator needs to belong to an existing Eskom customer.

  • Whether the generator is intending to export onto the grid, or not, Eskom will still need to ensure that
  • the connection is legal (registration, grid code compliance and adherence to technical standards);
  • that the tariff is a time-of-use (TOU) tariff option and appropriate meters are installed.
  • If non-adherence to the terms and conditions is evident, corrective action is taken (in the form of
  • remedial action i.e. Eskom will require the SSEG to be disconnected and a tamper fee maybe issued
  • and lost revenue recovered).

Yes, but wheeling is only allowed for accounts with an MV supply, – terms and conditions (T&Cs) apply.
Refer to question 2.

Yes, Authorised customers have various export options, but permission is required.

Yes, a bi-directional meter that measures energy on a time-of-use basis is required and is installed by Eskom.

Eskom will require the customer to have the following:

  • The latest Electricity Supply Agreement (ESA)
  • A NERSA registration letter for supplies greater than 100kW
  • A connection and use of system agreement (also called a supplementary agreement to the ESA)
  • An amendment agreement, if needed, for offset or banking of energy. Click here for more information.

Cost considerations

This information will assist in the assessment of the merit of the application which is done on a case by case basis.

There are no Eskom incentives but there are however benefits by using the grid as a battery. These are supported with tariff options for the surplus energy exported into the grid.

Each customer will need to assess his/her own return on investment.

Safety

Grid connected machines change the power flow on the Eskom network. If the operators do not know the existence of the generators, this poses a safety risk even with a carefully controlled operations process. The safety requirements require that Eskom gives permission for the SSEG to be grid tied.

Please consult with your supplier.

Tariffs

Eskom does not pay for the energy, however customers will receive credit on their bill for the electricity exported onto the grid under the Gen-offset tariff. This is done per time–of-use (TOU) period and is limited to the energy consumed in a month. There is an option for customers with SSEG up to 1MW to roll over the excess energy onto the next month under the banking policy, subject to conditions in the policy. Refer to the presentation on the website for more information. Click here for more information.

There are options for either wheeling of exported energy or consolidation of PODs (points of delivery),
subject to all prevailing policy, legal and regulatory requirements being adhered to. Refer to the presentation on the website for more information 

A generator wheeling on the Eskom network will pay applicable tariff charges (network charges,
administration charges, etc.) as stipulated in the schedule of standard charges (or Tariff book) available on the Eskom website click here for more information.

General

A generator wheeling on the Eskom network will pay applicable tariff charges (network charges, administration charges, etc.) as stipulated in the schedule of standard charges (or Tariff book) available on the Eskom website. Click here to access it.

It depends on the network connection under the current rules: 

  • For MV each application will be assessed individually.
  • The total generation that can be installed is based on the notified maximum demand (NMD). The
  • total generation is always less than 75% of NMD, with an upper limit of 350kW for LV Eskom
  • supplies.

Note: The application to Eskom must include all grid-tied generation (total generation = solar system
inclusive of batteries).

Yes. The types of SSEG that Eskom allow applications for are:

  • Wind generation
  • Photovoltaic generation (PV)
  • Biomass generation
  • Biogas generation
  • Hydro generation
  • Diesel generation
  • Battery generation
  • Fuel cells
  • Tidal and geo-thermal generation

Yes, it will reduce pressure on the grid when volumes of SSEG increase, but in order to stop loadshedding there will have to be many combinations of generation solutions.

The control of machinery is possible. Controls such as programmable logic controller (PLC) controls can
achieve this. But you would have to contact suppliers of this type of equipment.

A generator is a machine that converts energy to electricity. The source of the energy could come from a
variety of fuels or energy sources like diesel, wind, solar irradiance from the sun, stored or moving water
systems.

There are generators that are owned, operated and maintained by property owners or tenants and which supply some or all of their electrical power requirements. Non-Eskom owned generation refers to all generation that is owned by these property owners or tenants, including those within municipal areas.

This is a category of customer-owned generation that is less than 1MW (1000kW) in electrical power size and is connected to the Eskom network. Click here for more information.

The reasons are diverse, ranging from financial benefits in terms of paying less to the supply authority, to operational benefits such as avoiding loadshedding and loss of supply from the grid due to planned and unplanned maintenance on the supply authority’s grid.

Municipalities have their own rules for connection and associated costs. Please consult with your municipality if your electricity is supplied by them.

A grid-tied generator is a generator that is operating in parallel to the Eskom network i.e. it is synchronised to the Eskom network. A grid-tied generator needs the Eskom network to be on, in order to work. Eskom does not allow the connection of any SSEGs that can function in a hybrid mode where it can operate both parallel and non-parallel with the Eskom grid by means of electronic controls.

A stand-alone generator works when the Eskom network is off, or supplies a section of the customer plant not being supplied by Eskom.

An Independent Power Producer (IPP) is a generator greater than 1MW and is handled by Grid Access. An SSEG is a supply less than 1 MW and is handled by Eskom Distribution – Customer Service.

Due to the risk of excess generation on the networks for generators above 1MW, a blanket approval for banking is not allowed in the Banking of Energy policy. This will need to be approved on a case-by-case basis by the Eskom Customer Service Pricing Committee. If allowed, it will only be limited to infrequent and inadvertent over-generation i.e. not every month or more than 2 consecutive months. The customer should demonstrate that it would generally absorb the generated energy itself or deliver to another load.
If any of the above conditions are not met, all energy exported in a billing month will be forfeited. Click here for more information.

Eskom charges for the use of the system related to exported energy, plus if any wheeling, offset or banking is done, additional administration charges are charged. Click here for more information.

Yes, currently the offset rate is the same as the energy consumption rate in kWh. This might change in the future, and the updated rates would be applicable upon NERSA’s approval of the new rates.

No, the credits on the offset agreement are only on the energy (kWh) per TOU and do not reduce the other tariff rates. Click here for further information.

https://www.eskom.co.za/CustomerCare/NewSupply/Pages/GeneratorConnect.aspxThe current TOU periods are shown above – if you can manage load according to these time periods and cut consumption during the morning and evening peaks you will save. There are various energy efficient technologies that can be installed to reduce or stop energy consumption. The production processes would have to be evaluated to determine energy efficient technology options. Click here for more information.

No, banking of energy is only allowed for customers on a Time-Of-Use tariff. Click here for more information.

Customers will receive credit on their bill for the energy exported onto the grid under the Gen-offset tariff. This is done per time-of-use (TOU) period. To be credited, you will be required to have a legal connection and sign an amendment agreement to the supply agreement. Click here for more information.

Energy generated by the customer’s SSEG and which is not used by the customer, will flow out through the meter into the Eskom grid. Specially programmed bi-directional meters can measure this excess energy flowing out of the customer’s premises through the meter. Click here for more information.

Self-consumption – There is no energy that a customer is exporting into the grid i.e. all the energy that is generated by the SSEG is used by the customer.
Offset – The customer exports electricity into the grid and a credit is given to the customer. The customer cannot offset more than the net energy that he has used per time-of-use category (peak, standard, off-peak) for that month.
Banking – This is the surplus exported energy that is carried over to offset the next month’s consumption per TOU period. (Applicable for Eskom’s Financial year – April to March)
All the above options are considered to be grid tied and need to follow the process and adhere to the technical requirements. Click here for further information.

Currently Eskom does not consolidate generator points.

Additional FAQs

SSEG, distributed generation and distributed energy resources are naming conventions used in SA. The term, SSEG, is predominantly used in Eskom as it aligns with NRS097 definitions as a guide.

Licensing and registration of generators is done by NERSA and not Eskom distribution. As long as the Eskom application process, registration and technical connection rules have been met, the owner of the SSEG is in control of the economic merits of exporting power into the grid.

All Distributors technical requirements and applicable NERSA licence or registration requirements need to be adhered to.

The respective network service provider will manage any SSEG applications within their area of supply according to their qualifying criteria. Eskom manages the grid connection criteria for the SSEG. Technical and safety considerations include but not limited to, installation size and configuration, technical response and performance of energy management system, protection and control, equipment testing, quality of supply performance and plant certification. The statuary requirements for having such plant within the customers premise is the responsibility of the owner of the premise.

NERSA manages registration or licencing of prospective SSEG connections.

Applications could be declined in the following cases:

  • The supply is not in an Eskom area of supply – however if you are in an Eskom supply area and currently do not have a supply, you can apply to become an Eskom customer.
  • The supply is on a prepayment meter which is not yet accepted, however you can convert to a conventional metered supply and continue with your application (Eskom is exploring a temporary tariff solution for urban residential applications while awaiting NERSA approval on the residential time of use tariff).
  • The supply is not on a time-of-use tariff; however, you can apply for a conversion to a time-of-use tariff. Once converted you can complete the application process for a grid connection).
  • The wheeling request is for low-voltage supply, and SSEG applications are only allowed on medium-voltage supplies. The customer can apply for an upgrade of supply to an MV supply.
  • The grid tied request is for an SSEG that exceeds 75% of load capacity on a low-voltage network. However, a customer can apply to upgrade the load capacity where possible.

 

All staff working on connections and quotations have been trained; however, this is not a once off exercise but a change management journey.

Yes, the connection fees are charged for the connection of the generation facility, and this fee covers the cost associated with site inspections and quality assurance on commissioning of the installation.

Applications for shared feeders are being considered on a one-on-one basis. (Eskom is exploring a temporary tariff solution for urban residential applications while awaiting NERSA approval on the residential time of use tariff).

Yes the tariff is currently on a 1 to 1 basis, but Eskom is currently in the process of reviewing this as part of the tariff restructuring and unbundling of Eskom.

The installer has to either be, or use the services of a competent person, who is professionally registered and responsible to sign a test report, in certification of the safety protection and control of the SSEG plant.

The report will indicate that the installation has been inspected, examined against the necessary design, and technical documentation are been properly installed and tested.  The technical criteria and documentation includes compliance with the Grid Codes, NRS standards, SANS standards and the applicable statutory requirements. Eskom utilises the relevant NRS (097) and SANS (10142) standards or guidelines as a base framework for safe SSEG connections.  Information on the Eskom technical standards for SSEG installations can be obtained by registering on the NRS website: https://scot.eskom.co.za and use the following steps:

Click on “Login” on the right hand corner, and a login field will appear.

Click on “New user” and fill in your details as complete as possible.

Click on “Submit”

Eskom goes through a due diligence process on every application, to ensure that staff and network safety is not compromised.

Progress feedback is available on request as Eskom is currently working on an automated SMS feedback campaign.

If the diesel generation is used as a standby system with the PV system, then there is no problem with proceeding, providing all technical, safety and statutory requirements for standby systems are fulfilled. If both the diesel generator and PV system are grid tied, then a connection application is required for both.  

Yes, they are grid tied even with no export into the grid. There is no NRS approved inverter list that Eskom manages currently. All inverters have to be type tested to NRS with required testing certification and accreditation.

SANS 10142 -1 covers the LV wiring for all installations. UPS systems are not synchronised with the grid and UPS installation configurations and protection are covered by SANS.